Customization: | Available |
---|---|
After-sales Service: | Online and Engineers Available to Service |
Warranty: | 1 Year After Bl Date |
Still deciding? Get samples of US$ 78000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification | Unit | NMK-70S | NMK-100S |
Max. swing diameter | mm | Φ800 | Φ1200 |
Max. cutting diameter | mm | Φ780 | Φ1000 |
Spindle nose | A2-8/(Optional)A2-11 | A2-11 | |
Spindle speed | rpm | 2500 | Low-speed:20-340;High-speed:340-1500 |
Chuck outer diameter | inch | 304(12")/Optional15" | 610(24") |
Spindle bore | mm | Φ86 | Φ110 |
Spindle front bearing bore | mm | Φ130/OptionalΦ150 | Φ200 |
Spindle motor (continuous/30min) | kW | 15 / 18.5/22 | 18.5/22 |
Spindle torque | Nm | 357 / 590 can reduced speed 1:2 | 3663/373 |
Tool capacity | pc | E type 8/12 A type 6-row cutter/optional power turret | E type 10/12 row cutter/optional power turret |
External dia. toolholder | mm | 32 | 32 |
Inner dia. toolholder | mm | Φ50 | Φ50 |
X-axis stroke | mm | 440 | 730 |
Z-axis stroke | mm | 700 | 815 |
X/Z-axis rapid feed | m/min | 20 / 20 | 20 / 20 |
X/Z axis servo motors | kW | 3/ 3 | 4/ 4 |
Hydraulic tank capacity | L | 70 | 70 |
Hydraulic motors | kW | 2.2 | 2.2 |
Double stage pressure | Optional | Optional | |
Cooling water tank capacity | L | 250 | 300 |
Cooling water motor | kW | 0.75 | 0.75 |
Flushing motor | kW | 1.1 | 1.1 |
Repositioning accuracy | mm | 0.004 | 0.004 |
Positioning accuracy | mm | 0.008 | 0.008 |
Machine size L*W*H | mm | 1800*4500*3200 | 2750*5200*4700 |
Machine weight | kg | 7800 | 16500 |
3.FACTORY WORKSHOP & CUSTOMER FACTOR
CUSTOMER FACTORY
4.Company strength
Nanjing XinZhe CNC Machine Tool Co.,Ltd. was established in 2007. Located in Guabu CNC Industrial Park, Liuhe District, Nanjing, the company is mainly engaged in the research and development, manufacturing, technical consulting, sales and service of CNC machine tools, intelligent equipment and intelligent manufacturing systems.
CNC Solution for Metal Cutting Industry
The company insists on being customer-centered and constantly innovating. From the standard vertical, horizontal, and gantry processing centers, it gradually develops a variety of high-efficiency and labor-saving automatic special machine tools and production lines to meet the processing needs of customers. Customers are spread all over the country and abroad to many countries.The company has independently developed special machines and automated
production lines for full CNC parts machining, and has made major breakthroughs in leading companies of the industry such as SINOSTEEL, SINOTRUK, and Fuhua Heavy Industries.
The company adheres to the corporate tenet of "attitude determines everything, quality makes the future", carries forward the spirit of innovation and excellence, builds a positive, dedicated and loving team, serves customers with heart and soul, and produces high-quality products!
package
FAQ | |
Q1 A1 |
How can I choose the most suitable machines ? If you are the factory, please tell me your specifications request or our workpiece drawing, our professional engineer team will suggest the suitable model for you. If you are the trading company, you can tell us your customer's request or we will suggest you our best selling model for you. |
Q2 A2 |
Where is our factory located? How can I visit there? Our factory is located in NanJing City, JiangSu Province, China. You are warmly welcomed to visit us. We can send the invitation letter to you and pick up you from Nanjing Airport to our factory. |
Q3 A3 |
How is the warranty? We will supply standard ports and accessories with our machine when shipment. Within one year after receiving our machines, in the right operation, if there are any damaged parts or accessories, we will replace them by air or express immediately free of charge. |
Q4 A4 |
Do you have a stock? Our Chinese market order is very good, we have many machines produce everyday and delivery everyday. Our fastest delivery time for 1~5 sets will be within one month. |
Q5 A5 |
How about your quality? We have approved the ISO9001:2008 Quality management system. ISO14001 Environmental management system. Most products have been approved by the European and American safety standards, including CE,GS, EMS & UL. 90% of our products are exported to more than 60 countries and regions around the world, especially to Europe and America market and always win high reputation. So you can rest assured of our quality products and our best services. |
Q6 A6 |
Do you have professional engineers? Yeah, we have professional engineers and designers, We can provide OEM services. The most important development part is our technical and quality. |
Q7 A7 |
What is the package? Machine is by waterproof cloth to covered. And e packed by standard exported wooden case with steel foot. It is very much strong for oversea transportation. |
Q8 A8 |
What's your main products of your company? We specialized in all kinds of machines ,such as Vertical Machining Center, Horizontal Machining Center, 5 axis Machining Center, Gantry Machining Center, CNC Vertical Chuck Turning Machine, Boring and Milling Machine and Custom Machine Tool . |
Q9 A9 |
What's the MOQ? One set. The big discount will start from three sets. |
Q10 A10 |
What's the Payment Terms ? T/T,30% initial payment when order,70% balance payment before shipment; Irrevocable LC. Other way can discuss according to different situation. |
Q11 A11 |
What is the charge of installing and commissioning? Most of machines you can install well according to our drawing. For some machines, it need our technician to go to your local site and help you install and commission machines. At the same time, our technician will train your workers, it will table about 7~15days for different machines. The return air-tickets, accommodation, food, salary (USD100.00/day for each technician), etc will be born by the end-user. |